At a Glance

Equipment Relocation Projects · Food Manufacturing Relocation · Industrial Project Management · Custom Stainless Steel Fabrication

The client is a premier global food manufacturer with a portfolio of more than 100 brands across six continents, providing the Australian and New Zealand markets with world-class product expertise.

This project involved the strategic relocation of four production lines and three silos from the client’s Victorian premises to their facility in New South Wales.

The Challenge

  • Managing the complex interstate relocation of four production lines and three silos from Victoria to New South Wales.
  • Coordinating continuous labour schedules across two states to meet the client’s exceptionally tight removal and production deadlines.
  • Organising heavy haulage and sensitive freight for specialised machinery while maintaining strict food safety and hygiene standards.
  • Overseeing various sub-contractors and engineers for the technical disconnection and re-installation of all major plant equipment.

The Solution

  • Delivered a comprehensive turnkey solution including full project management, sensitive freight transport, heavy haulage, and essential hire equipment.
  • Operated a continuous 24-hour labour schedule across both states to strictly adhere to removal and production timeframes.
  • Coordinated specialist sub-contractors for electrical and refrigeration services to ensure the efficient disconnection and re-installation of equipment.
  • Utilised in-house engineering and workshop capabilities to design and fabricate custom platforms, pipework, and conveyors for the project.

The Outcome

  • The project was successfully delivered on time and within budget, resulting in total customer satisfaction for the client.
  • All installations met strict food-grade guidelines and exceeded Australian Standards, ensuring high-quality design functionality and superior operational performance.
  • Our workshop provided top-tier custom fabrication items that met all customer requirements within the specified project delivery timelines.
  • Maintained a perfect safety record with zero on-site incidents and one hundred per cent compliance throughout the project.