General Mills / Latina Pasta

Relocation and equipment install from Mount Waverley Victoria to Rooty Hill NSW (March 2017 > August 2018)
Scope: Relocation of General Mills Victoria to Rooty Hill NSW
  • Jarlam provided complete project management for this relocation.
  • Relocation of 4 production lines from Mount Waverley Vic to Rooty Hill NSW. We achieved tight deadlines by running 24hr labour coverage (10 days to remove & reinstall the lines)
  • Install stainless steel chilled water lines throughout plant
  • Check Weigher Platform relocation's & packaging lines
  • Assisted in relocation of boiler along with re-installation
  • Sensitive freight moving of equipment, Jarlam managed transport, cranage and associated equipment hire
  • Jarlam’s scope included electrical and refrigeration disconnection and re-connection
  • Provide ongoing maintenance labour support
  • Relocation of 3 silos
  • Fabrication of platforms and conveyors for upgrade of production lines
  • Make good of factory
  • Installed semolina stainless steel pipe work from silo’s to day bins and production lines

Fyna Foods

Equipment Relocation and installation (February 2016 > July 2016)
Scope: Relocation of Pink Lady Chocolates from Huntingdale to Hallam
  • Jarlam provided complete project management for this relocation.
  • Install stainless steel chilled water lines throughout plant
  • Check Weigher Platform relocation's
  • Relocation of production lines from Huntingdale to Hallam
  • Jarlam supervised transport, cranage and associated equipment hire
  • Jarlam’s scope included electrical and refrigeration disconnection and re-connection
  • Provide ongoing maintenance labour support
  • Relocated 2 Bindler chocolate production lines
  • Fabricated Jacketed supply chocolate pipe work

Linpac

Truganina Plant set up, equipment install and relocation (March 2015 > Jan 2016)
Scope: Relocation of WA plant to Victoria.
  • Plant services set up i.e. Electrical gantries, compressors, airlines
  • Design and install post barriers, platforms, safety guards
  • Installation and commission of thermoformer and extruder lines
  • Project manage mechanical aspects of plant set-up
  • Supervise safety audit upgrade and implicate
  • Install complete stainless steel chilled water lines throughout plant
  • Supply a qualified maintenance fitter to upgrade existing equipment after relocation

Orora

Laverton Plant Decommission and factory make good (August 2013 > June 2014)
Scope: Remove 6 printing lines and remove redundant equipment and services.
  • Decommission and strip out entire Laverton plant
  • Govern and manage asbestos removal of oven equipment
  • Remove 6 x ovens over 50 metres in length and all associated printing presses and equipment
  • Removal of 43 roof stack’s and make good
  • Project management of all mechanical aspects of decommission including cranage and scrap

Kerry

Plant consolidation (July 2014 > July 2015)
Scope: Heidelberg Plant Relocation, Mansfield Plant (Queensland).
  • Plant relocation to the central Altona site
  • Relocate 9 production lines including 5 spiral freezer accumulators
  • Fabricate platforms/walkways/conveying systems
  • Modifications and repairs to existing equipment to suit new plant layout
  • Project management all mechanical aspects of relocation work including cranage, transport and liaise with associated trades

Amcor

Thomastown Plant Decommission and Equipment relocation (May 2013 > Jan 2014)
Scope: Relocate caps line equipment from Thomastown to Knoxfield. Install and commission equipment. Remove redundant equipment and services.
  • Relocate Line equipment
  • Fabricate platforms/walkways/bollards
  • Coordinate auctioned line removal
  • Decommission and strip out entire Thomastown plant with an emphasis on budget and safety